Unfavourable weather conditions may affect timelines. Visit the Traffic Watch Map for real-time traffic updates.
Current Service Disruptions:
- Brookdale Road from Concession 7 to Foxfire Chase North lane of Brookdale Rd between # 750 & #770 will be CLOSED between 7:00am Feb. 3, 2025 to 12:00noon Feb. 8, 2025. Local Traffic, School Buses and Emergency Vehicle will have access. Traffic will be maintained and controlled by certified flagmen and/or Paid Duty Police Officers. This lane is being closed to facilitate parking of generators on the road and loading and unloading of trucks into all terrain vehicles being used on property. In the case of a snow clearing emergency this lane closure will be opened per the Town of Uxbridge.
- Concession Road 7(Regional Road 1) from 200 metres south of Sandford Road (Regional Road 11) to 400 metres north of Ashworth Road, and from 100 metres south of Foster Drive to Harrison Drive, July 16 to December 2024
Pavement reconstruction, including shoulder, replacement of culverts and installation of guide rail. - Uxbridge-East Gwillimbury Townline from north of Durham Reg. Rd. 39/Queensville Sideroad to south of Holborn Road, East Gwillimbury
Bridge repairs over the Mount Albert Creek require road closures anticipated to commence late 2024. - Uxbridge-East Gwillimbury Townline from York St. (500m south of Ravenshoe Rd.), to Zephyr Rd.
Bridge repairs require road closures anticipated to commence late 2024. - Concession Road 7 (Reg. Rd. 1) from 200m south of Sandford Road (Reg. Rd. 11) to 400m north of Ashworth Road, and from 100m south of Foster Drive to Harrison Drive, summer 2024 to summer 2025
Road closures and detours will be in place, to provide for installation of guard rails, paved shoulders, gutter and culvert replacements and road reconstruction.. - South Balsam Stormwater Pond Rehabilitation. November 4th – June 30th, 2025 The Township of Uxbridge has obtained all necessary permits to proceed with the reconstruction of South Balsam Pond. Construction is set to begin in the first week of November and will continue through the winter, weather dependent. The project is tentatively scheduled for completion by June 30, 2025.
- Service Disruption: South Balsam Trail will be closed for the duration of the construction.
- Public Consultation: A public information centre was hosted on February 16th, 2023.
- Related Documents: Notice of Construction, Full Project Draft Drawing
- Contact: Ben Kester, C.E.T., CRS-S, Director of Special Projects; bkester@uxbridge.ca